卡通动漫第一页久久 国内国外内射免费视频 精品爆乳一区二区三区 91嫩草久久

To provide customers with systematic
and intelligent water treatment solutions
Current location: Home Page > News > Industry Trends
What necessary investigations should be made before
Time:2021-07-08 10:01:49
Article release:Admin
Original author:Unknown
Source:Internet

What necessary investigations should be made before screening corrosion and scale inhibitors


As we all know, corrosion inhibitor is a kind of substance added to water that can interfere with the electrochemical action of corrosion and can prevent or reduce the corrosion rate of metal. Before using experimental verification, we should master the actual situation on the site and conduct a comprehensive investigation on the circulating cooling water system to be processed. This is also an important basis for Ande technology to choose recycled water agents. The specific methods are summarized as follows:




(1) Water quality




(1) Understand the source water is surface water or groundwater, whether it is polluted. Groundwater shall be analyzed quarterly for not less than one year. If there are several Wells, the water quality of each well should be known. For surface water, complete monthly analysis data of not less than one year should be collected.




(2) Supplement water quality to understand whether the raw water, after pretreatment and pretreatment methods, the use of flocculant or coagulant varieties. Full monthly water quality analysis data of not less than one year shall be collected. '




(3) water quality of circulating cooling




If the circulation system has been in operation, the on-site circulating water quality data can be directly used as the basis for selecting the formula. However, data should be selected when the concentration multiple is stable, at least monthly data for a year. The data at natural pH values should be known as far as possible. '-




(2) Design data of circulating cooling water system




Need to understand the type of cooling tower, circulating water FFI (m3/h), the system 'volume V (m3), the design of inlet and outlet tower water temperature (°C). It is also necessary to know the concentration multiple possible for the system and the effluent B(m3/h), wind-blown loss D(MVh) and replenishment M(m3/h) at the operating multiple. And understand the annual temperature, humidity and water temperature trends. ,




The average residence time of the agent in the system, T[V7(B+D)], should not exceed 50h in order to prevent the agent from decomposing or precipitating from hydrolysis.




(3) Data and process characteristics of the water cooler




Need to understand all the data of water treatment cooler, including the number, model, structure, material, thermal strength, process medium inlet and outlet water temperature, water flow rate and other issues.




(4) Understand the surrounding discharge environment and air pollution, understand the environment of the area through which sewage flows after discharge, whether there are agricultural crops, aquatic crops and the final discharge water area, etc., all of which will affect the stability of the circulating water system.



Label:
平山县| 沙雅县| 资溪县| 德阳市| 黄陵县| 青神县| 大竹县| 浮山县| 五大连池市| 青神县| 邵东县| 亳州市| 澳门| 阳高县| 青龙| 芦山县| 汶上县| 玛多县| 新干县| 凤山市| 济宁市| 红桥区| 夏津县| 西贡区| 桂平市| 赤城县| 桃源县| 紫云| 团风县| 澎湖县| 瑞安市| 东莞市| 西乌| 深泽县| 泰来县| 石首市| 天峨县| 千阳县| 汽车| 辽阳市| 福鼎市|